top of page
箭頭-51.png
主題名稱-05.png
動作插圖-05.png
網頁底1_工作區域 1.jpg
元素-06.png

​裝置藝術簡介

0 1

INSTALLATION ART 

1912年阿里山林業鐵路全線竣工,初期以運材功能為主,之後擴大開辦客貨運輸,主線長達約72公里,從嘉義市海拔30公尺的北門車站爬升到海拔2274公尺的沼平,沿線穿越熱帶林、暖帶林、溫帶林。

The Alishan Forest Railway was completed in 1912. Early on, the railway was only used for the transportation of wood. Later, the railway expanded its operation to transport passengers. The railway’s main line is approximately 72 kilometers long, climbing from the Beimen Station in Chiayi City at an elevation of 30 meters to Zhaoping at 2,274 meters above sea level, passing by tropical, subtropical, and temperate forests along the way. 

照片2-05.jpg

​裝置藝術導覽

0 2

INSTALLATION ART 

作業順序-05.png
堆積木原木
bottom of page